Momentum
Library 2010
Our state-of-the-art Library will be the centrepiece of the new University Common. Environmentally sustainable in its design – a key feature is that it will exploit natural ventilation and lighting opportunities - the new Library will focus on providing dynamic learning spaces where students can connect with each other and the resources they require. To create the space needed, the Library will locate much of its resources in an automated storage and retrieval system (ASRS) - a first for a library in Australia.
Other features of the new Library include:
- 3,000 seat capacity
- Registered for a Green Star - Library rating on sustainability
- Living courtyards
- Learning lounges open 24/7
- Dedicated postgraduate and research areas
- Training, meeting and consultation rooms
- Adaptable, high tech personal and open plan learning spaces
- Support for technology enabled learning
- Exhibition spaces featuring entrance including the Lachlan Macquarie Room
- Café at Library entrance
What's happening?
Updates
October 2009
Level 3 and 4 suspended slab formwork is now in place and work has commenced on forming level 5 slab. Completion of concrete placement to level 3 and 4 slabs are programmed to be complete by the end of October 2009. The contractor is targeting to have the building structure completed by the end of the year. Services design and infrastructure works are continuing.
10 August 2009 - Building works at library site during August 2009
This information below is provided to all staff in buildings W3B, C3A and C3B who may be affected by the building works on the new library site.
Bulletins will be issued fortnightly, unless there are significant changes in the mean time.
| 10 – 12 August | Continue with reinforcement, post tensioning for the Level 2 slabs (Western End of the site). Commence reinforcement, post-tensioning for the Level 3 slab (Eastern End of the site) |
| 13 August | Complete reinforcement, post tensioning for the Level 2 slabs (Western End of the site). Continue reinforcement, post-tensioning for the Level 3 slab (Eastern End of the site) |
| 14 – 18 August | Pour level 2 suspension deck (Western End of the site). Continue reinforcement, post-tensioning for the Level 3 slab (Eastern End of the site). Continue formwork for Level 3 slab (Western End of Site). |
| 19 August | Complete reinforcement, post tensioning for the Level 3 slabs (Eastern End of the site). Continue reinforcement, post-tensioning for the Level 3 suspension slab (Central part of site). Continue formwork for Level 3 slab (Western End of Site). |
| 20 August | Pour of Level 3 slabs commences (Eastern End of the site). Continue reinforcement, post-tensioning for the Level 3 suspension slab (Central part of site). Continue formwork for Level 3 slab (Western End of Site). |
| 21 August | Continue reinforcement, post-tensioning for the Level 3 suspension slab(Central part of site). Continue formwork for Level 3 slab (Western End of Site). |
The following equipment will be in operation at varying times:
Diesel Compressor
12 Tonne Excavator
Rock Breaker
Concrete vibrator
Concrete Truck
Concrete pump
Electric Compressor
Tower Crane
This information is provided as a guide only. Works are subject to change due to weather and other factors outside the University's Control.
For all enquiries please contact Michael Carley (michael.carley@mq.edu.au), Manager, Staff Health, Human Resources.
July 2009 - Enhancements to Library website
The new Library website has been redesigned in consultation academics, students as well as a wide range of Library clients, and incorporates recommendations, feedback and usability testing results.
The University's new logo and visual identity have been implemented during this redesign and the new website has:
- Clearer navigation including information for first time users
- A search interface on the homepage for the catalogue
- Search interfaces on the homepage to enable students and staff to find unit readings, journal titles and databases
- More client focused content
Please update your bookmarks to www.lib.mq.edu.au
June 2009
Bulk excavation has now been completed with only isolated detail excavation to go. Level 0 (ASRS) slab on ground has now been poured, with level 1 slab on ground 60% complete. Formwork to the level 2 slab is approximately 40% complete. Services infrastructure works have authority approval and are now underway.
15 May 2009 - Macquarie Drive - Closure of Northern Lane for Construction Zone
On Monday 18 May 2009 the contractor for the new Library project will implement the site Construction Zone in the northern lane of Macquarie Drive adjacent to the site. This Construction Zone will remain in use during the remainder of the project however, if use is not required at any particular time the lane will be opened for general traffic use.
Please refer to the attached Traffic Management Plan diagram.
May 2009
AW Edwards Pty Ltd has completed the bulk and detailed excavation and associated perimeter retaining walls and shoring. With the completion of the earthworks, subsoil drainage works are underway. Preparatory works for the placement of the Level 1 slab will follow.
AW Edwards has implemented the construction zone along Macquarie Drive and installed two electric tower cranes on site.
April 2009
The final Design and Construct contract for the Project was executed on 11 March 2009.
Works on site have commenced with the bulk excavation and shoring for the project currently underway. These works have significantly progressed such that the works are currently approximately 70% complete. Contiguous piling commenced mid March with approximately one third completed to date and it is expected that the majority of excavation works will be completed by mid May 2009.
Towards the completion of the earthworks two electric tower cranes will be erected on the site, these cranes have been selected because they provide the best environmental solution both in terms of fuel type and minimised operational noise levels. Additionally they utilise the latest technology to ensure that load movement is accurately controlled so at no time will any material be lifted above adjacent buildings.
Update 10 February, 2009 - Building works near C3A, C3B and W3A
The commencement of earth works for the new library site is affecting the working conditions for staff in C3A, C3B and W3A. The University is putting the following strategies in place to help reduce any inconvenience caused and mitigate any safety concerns:
Access
What's happening now:
- People with disabilities affected by the changes are asked to contact Michael Carley on ext 9725 so arrangements can be made to assist them
- Crossing attendants will be used during the first few weeks of term for busy periods of the day
- Installation of traffic mirrors at crossing parking at C2 and E1 on Macquarie Drive
- Reviewing signage around work zones to make them clearer
- Fencing installation to prevent students, staff and visitors crossing Macquarie Drive, except at designated crossing points
- Review access to C3A and C5A clinics via pathway along access road behind C4B
- Review pedestrian crossing at W1, W2 to main campus, with a view of moving it for improved pedestrian safety
- Review access for service vehicles
- Installation of traffic speed monitors on Macquarie Drive
- Consideration of use of traffic/pedestrian control lights
- Liaise with RTA to increase traffic light turnaround times at Herring and Balaclava Roads exits to keep traffic flowing out of the University at peak times.
Looking at:
- Review traffic management plan to smooth out issues due to increases in traffic flow with the commencement of semester
- Review special permit parking closer to buildings affected.
Heat
What's happening now:
- Installation of portable air coolers in C3A. Installation into C3B is currently being reviewed
- Further air cooling devices will be considered following an audit of all three buildings. This may include provision of stand alone air cooling units
- Hiring of water coolers for each floor of C3A and C3B
- Installation of blinds on all South Facing windows in building C3A, C3B and W3A – staff are provided with an option of either roman or vertical blinds
- Installation of a shade cloth covering between the buildings and the building site.
Looking at:
- Longer term strategy for temperature control in C3A and C3B, including the installation of cooling systems.
Staff in the affected buildings can assist by:
- Leaving their doors open where possible
- If you are on the northern side of the buildings, please open windows to allow cool air to enter the building (except where you have air-conditioning). On the southern side please leave windows closed
- If you have an Air-Conditioning unit, please leave the air conditioner on at all times (inc. night) during days with high temperatures and leave your door ajar to allow cool air to flow into the common areas of the buildings.
- In vacant rooms on the northern side of the buildings, please open windows or turn air conditioners on. Leave the doors open and allow the cool air into the common areas
- If you are on the south side of the buildings, please leave blinds or window coverings pulled across the window during the heat of the day.
- Turn off computers and lights etc. when not required
- Leave fans on day and night.
Glare
What's happening now:
- Installation of blinds on all south facing windows in buildings C3A, C3B and W3A to assist with glare reduction
- Purchase of anti–glare screens for computers where necessary. Please contact Michael Carley on Ext 9725 to arrange
- Installation of shade cloth structure to assist with glare reduction.
Looking at:
- Longer term strategy for reducing glare on affected buildings, including the use of anti-glare film.
Dust
What's happening now
- Taping of window seals and other possible dust entry points
- Increase cleaning of affected buildings, including vacuuming and dusting.
- Shade cloth structure will assist with dust reduction.
- Office of Major Projects to hold discussions with the site contractor to work out ways to reduce dust
Looking at:
- Further minimisation strategies will be considered if required
- The viability of using extractor fans in buildings.
Noise
What's happening now:
- Office of Major Projects to hold discussions with the Site Contractor to review noise minimisation strategies
- OFM to seek information on possible noise minimisation strategies including double glazing.
General issues
What's happening now:
- Heat, dust and noise monitors have been installed into affected buildings
- Staff with health concerns will be contacted by Michael Carley (Manager, Staff Health & Safety) to discuss specific measures to reduce the impact of the building works.
Ants - OFM to arrange to treat affected areas.
OHS/Emergency Issues
- Emergency evacuation points for the three buildings have changed. New maps have been produced and have been installed. Further information regarding the changes will be sent to affected staff.
- Security and Emergency services are to be advised of the changes.
Working from home
- Where appropriate staff can elect to work from home (on days where they are not required to be on campus) after discussion with their relevant Department Head.
Consultation
- Setting up of an information webpage to provide staff with updated information on building works and anticipated impact on residents of affected buildings.
- Fortnightly meeting between the University and representatives from the affected buildings.
- Increase information emails advising staff of updates.
- One dedicated person responsible for receiving concerns and issues, coordinating mitigation strategies and organising remedial actions on such matters. This contact is Michael Carley, Manager, Staff Health & Safety.
- Implementing a communication strategy to students regarding the changes and impacts on parking and access.
Environmental concerns
- An extensive assessment has been undertaken of the greenspace in front of C3A, C3B and W3A. No threatened species of flora or fauna have been identified in this area. Following completion of the library, landscaping will be undertaken to enhance the entrance and green areas around the building. It is important to note that 50 per cent of the library roof will be open sustainable landscaped areas.
- Replacement trees will be planted to replace trees removed from the site and will be located to enhance existing wildlife corridors. Planting of some of these trees will commence in Spring 2009.
If you require further information or have other concerns, please do not hesitate to contact Michael Carley on ext 9725 or by email at michael.carley@mq.edu.au.
21 November, 2008 - Trees, Shrubs & Wildlife: What's happening on the new Library site?
The new Library site is an open, grassed area currently planted with trees and shrubs. Thorough ecological assessments have been carried out on this site to ensure no threatened habitats or species will be affected by this development. More on the environment and the Library site (PDF 1.4Mb).
We're tagging 1.4 million items!
The new Library will feature an automated storage and retrieval system (ASRS) - a first for an Australian library. To prepare our collection for this system we are tagging and barcoding 1.4 million items. More on tagging... (PDF 782kb)
Timeline
| Dates | Activity / Event |
|---|---|
| 1967 - 1975 | Stages 1-4 of the existing Library open |
| 1987 | Discussion begins on plans to extend and refurbish the existing Library to Stage 5 |
| 2000 | Discussions continue in relation to building of co-generation plant built beside existing Library |
| 2002 | Extensive research into alternative designs |
| 2003 - 2004 | MoveCorp Pty Ltd facilitates the development of a Facilities Master Plan for the Library |
| 2005 | Ongoing research into alternative concepts and designs |
| 2006 | New Library building approved to incorporate Automated Storage & Retrieval System (ASRS) |
| 2007 | Project Control Group established for New Library; winning design chosen Environmental Assessment Report (PDF 1117) released |
| 2008 | Approvals, Tenders and Contracts |
| 2009 | Construction |
| 2010 | Project completion |
Got a story to share?
If These Walls Could Talk.... Tell us your Library story!
Did you know that a murder suspect was once holed up inside the Library? Or that some enterprising students once set up an impromptu gourmet kitchen in one of the study rooms? Or that over the years stack has proved a popular place for amorous couples to rendezvous?
By some estimates, over 200,000 individual students and staff have used our current Library over its 40 year life. There are plenty of stories to tell...
Got one of your own?
librarystories@library.mq.edu.au
Ballad of a Thin Man: We're gathering your library stories
"You've been with the professors
And they've all liked your looks
With great lawyers you have
Discussed lepers and crooks
You've been through all of
F. Scott Fitzgerald's books
You're very well read
It's well known
Because something is happening here
But you don't know what it is
Do you, Mister Jones?"
Bob Dylan,
'Ballad of a Thin Man'
Highway 61 Revisited (1965)
Contact
Maxine Brodie
University Librarian
Macquarie University Library
Phone:(02) 9850 7546
Email: maxine.brodie@mq.edu.au
Jennifer Peasley
Deputy University Librarian
Macquarie University Library
Phone: (02) 9850 6535
Email: jennifer.peasley@mq.edu.au